一,地基的硬度
1、 Hardness of foundation
在澆筑底子之前,應(yīng)該事先測量好佳地基的硬度,如果地形特殊或者是地基的硬度相差太大,就需要做特殊處理,才能確保彩鋼活動板房能夠順利裝配并且保障裝配以后的質(zhì)量,具體如何做特殊處理,應(yīng)該和技術(shù)部溝通以后,視實際情況來決定。
Before pouring the foundation, the hardness of the foundation shall be measured in advance. If the terrain is special or the hardness difference of the foundation is too large, special treatment shall be done to ensure that the color steel movable slab house can be assembled smoothly and ensure the quality after assembly. The specific treatment shall be determined according to the actual situation after communicating with the technology department.
二,底子的程度
2、 Degree of foundation
在底子澆筑的時候,一定要測量好佳程度,底子澆筑完以后,程度誤差需要控制在10mm以內(nèi);
During the pouring of the base, the degree must be measured. After the pouring of the base, the degree error needs to be controlled within 10mm;
三,混凝土的標(biāo)號
3、 Grade of concrete
大部分的尺度板房底子是C20,常規(guī)情況下里面是沒有鋼筋的,如果地形,地基有特殊情況,或者對于活動板房有特殊要求,就要以技術(shù)部出的圖紙為準(zhǔn)進(jìn)行施工;
Most of the standard plank houses have C20 bottom, and there is no reinforcement inside under normal circumstances. If there are special conditions in terrain and foundation, or there are special requirements for movable plank houses, the construction shall be subject to the drawings issued by the technology department;
四,底子的澆筑時間
4、 Pouring time of foundation
彩鋼活動板房的底子澆筑時間應(yīng)該和混凝土的澆筑工藝一樣,不能減少工藝順序,在底子澆筑完成和板房裝配之間應(yīng)該留有充分的時間確保地基達(dá)到標(biāo)準(zhǔn)硬度;
The bottom pouring time of color steel movable slab house shall be the same as that of concrete, and the process sequence cannot be reduced. Sufficient time shall be reserved between the completion of bottom pouring and the assembly of slab house to ensure that the foundation reaches the standard hardness;
五,為了保障裝配工作,裝配的質(zhì)量和裝配以后整潔美觀,在制造地基的同時,也要把室內(nèi)地面一起澆筑完成,高度和底子一樣,在活動板房裝配完成以后,在室內(nèi)鋪設(shè)地磚方便又整潔。不會影響到房子的外觀和質(zhì)量,室內(nèi)地板的高度應(yīng)該比底子程度高出50mm,確保雨水不會流入室內(nèi)和地圈梁的堅固水平。
5、 In order to ensure the assembly work, the quality of the assembly and the cleanliness and beauty after assembly, the indoor ground shall be poured together while manufacturing the foundation, and the height is the same as the bottom. After the assembly of the movable plank house, it is convenient and tidy to lay floor tiles indoors. It will not affect the appearance and quality of the house. The height of the indoor floor should be 50mm higher than the bottom to ensure that the rainwater will not flow into the room and the solid level of the ground ring beam.
The above is today's content sharing provided by Jinan color steel plank house. For more wonderful content, please click our website http://szgdbearing.com We will have more content for you later