您好,歡迎訪問禹城泰瑞彩鋼復(fù)合板加工廠!

服務(wù)熱線

18765446878

熱門關(guān)鍵詞:禹城彩鋼廠,禹城彩鋼復(fù)合板,禹城鋼結(jié)構(gòu)板房 彩鋼板房
當前位置:首頁>新聞資訊>新聞動態(tài)鋼結(jié)構(gòu)活動板房地基處理方式!

鋼結(jié)構(gòu)活動板房地基處理方式!

來源:http://szgdbearing.com 日期:2023-11-13 發(fā)布人:
鋼結(jié)構(gòu)活動板房是目前使用為廣泛的臨時住房建筑,雖然活動房的主要骨架是鋼結(jié)構(gòu)的,但它的地基可不是,大多數(shù)地基是混凝土結(jié)構(gòu)的,鋼結(jié)構(gòu)活動板房對地基的硬度有一定要求,地基的硬度決定了要不要做特殊處理,打好地基對于工程來說關(guān)重要。
Steel structure prefabricated houses are currently widely used temporary housing buildings. Although the main skeleton of the prefabricated house is steel structure, its foundation is not. Most foundations are concrete structures, and steel structure prefabricated houses have certain requirements for the hardness of the foundation. The hardness of the foundation determines whether special treatment is necessary, and laying a good foundation is crucial for the project.
1.要進行硬度測試,特殊的地形和地基的硬度對建造活動房來說有較大的差別,應(yīng)當作特殊的處理,保證鋼結(jié)構(gòu)活動板房可以順利安裝,確保其質(zhì)量,技術(shù)人員應(yīng)該提前進行測量。
Firstly, hardness testing should be conducted. Special terrain and foundation hardness have significant differences for the construction of prefabricated houses, and special measures should be taken to ensure the smooth installation of steel structure prefabricated houses and their quality. Technical personnel should conduct measurements in advance.
2.完成了地基的測量后,接下來就是基礎(chǔ)澆筑,這時的在于必須先測量好水平,在完成了澆筑后,應(yīng)該控制水平的誤差在10mm內(nèi)。必須要保證基礎(chǔ)面水平在誤差以內(nèi),這樣才不會影響后續(xù)的工作進程。
禹城鋼結(jié)構(gòu)板房
After completing the measurement of the foundation, the next step is foundation pouring. At this point, the key is to measure the level first. After completing the pouring, the horizontal error should be controlled within 10mm. It is necessary to ensure that the level of the foundation surface is within the error range, so as not to affect the subsequent work process.
3.混凝土標號,一般情況下基礎(chǔ)為c20且內(nèi)無鋼筋,當然,在特殊的地形或者其他不可抗拒的條件下,應(yīng)當根據(jù)技術(shù)人員的測定來頂下終方案。
3. Concrete grade, usually based on c20 and without steel bars inside. However, in special terrain or other irresistible conditions, the final plan should be determined based on the determination of technical personnel.
4.澆注時間,跟常規(guī)的混凝土澆筑工藝一樣,鋼結(jié)構(gòu)活動板房同樣不可以減少工藝程序,基礎(chǔ)澆筑完成后或者活動板房安裝之前應(yīng)該留充分的時間讓混凝土達到硬度要求。
4. Pouring time: Like conventional concrete pouring processes, steel structure prefabricated houses cannot reduce the process procedures. After the foundation pouring is completed or before the installation of the prefabricated house, sufficient time should be left to ensure that the concrete meets the hardness requirements.
5.澆筑,制作基礎(chǔ)的同時,必須跟室內(nèi)地面一起澆筑完成,水平高度跟基礎(chǔ)一樣,這樣可以確保安裝工期、質(zhì)量以及安裝后的美觀。活動板房安裝好了以后,在室內(nèi)鋪地板,這樣既方便又整潔。
5. Pouring, while making the foundation, must be completed together with the indoor floor, with the same horizontal height as the foundation, to ensure the installation period, quality, and aesthetics after installation. After the installation of the prefabricated house, the floor should be laid indoors, which is both convenient and tidy.

聯(lián)系電話:18765446878

咨詢熱線:18765446878(微信同號)

地址:禹城市十里望鎮(zhèn)山東國際商貿(mào)港往南660米

備案號:魯ICP備2023024436號 魯公網(wǎng)安備37010202001695號 網(wǎng)站地圖|XML|TXT

微信二維碼

微信二維碼

石阡县| 博罗县| 丹巴县| 义马市| 工布江达县| 长葛市| 鱼台县| 墨竹工卡县| 洪湖市| 宝鸡市| 墨江| 临海市| 郸城县| 辉县市| 茌平县| 沙洋县| 平定县| 昭觉县| 抚州市| 尚志市| 拉萨市| 灵璧县| 读书| 平泉县| 东辽县| 浦城县| 昆明市| 海晏县| 巢湖市| 侯马市| 法库县| 澄城县| 高陵县| 苏尼特右旗| 探索| 卫辉市| 察雅县| 珠海市| 开化县| 习水县| 吉首市|